Hansen Switch Kit HLLSW with Long Leads for Purger
Brand: Hansen
SKU: 20-1018
Product Weight
2.0 lb
Price
Original price
$1,459.98
-
Original price
$1,459.98
Original price
$1,459.98
$1,459.98
-
$1,459.98
Current price
$1,459.98
Product Description
The Hansen Switch Kit HLLSW is designed for use in purger systems, featuring long leads for flexible installation. This kit ensures reliable operation and system control. Key features include:
- Long leads for easy installation
- Durable switch design for extended use
- Compatible with various purger systems
Maintain efficient system control with this reliable switch kit.
Fast Delivery & Shipping
We provide fast shipping and delivery across Canada and the USA.
Return Policy
Need to return a part? Contact our support team within 7 days of receiving the item.